Ski Lodge Madarao

  • #5 Crowd renovators

    After having finished all the infrastructure behind the walls and underneath the floor it was finally time to put our own signature to the downstairs floor. We decided to plaster t [...]

  • Blog #4: floors and walls

    After having worked in a concrete dungeon for a while it was a big relief to have the smel [...]

  • #3 Preparation

    We realize it’s been a while…You must be thinking we got stuck at the demolition part. [...]

  • Categories


    BOOK